人人操人av,国产高清AV,就是干在线观看AV,中东A片,久久久久久久777

螺杆捏合机
南通福斯特机械制造有限公司
Select language:
螺杆捏合机
Tel:0513-87540518

Maintenance specification for vacuum kneader

Vacuum kneader is mainly composed of kneading part, base part, hydraulic system, transmission system, vacuum system and electric control system. It is widely used in chemical production fields prone to bubbles such as silicone rubber, glass adhesive, butyl adhesive and hot melt adhesive. It is a technologically advanced machine in kneader industry. For all machinery, correct maintenance is an important guarantee to ensure its normal operation and prolong its service life. Therefore, we should not only focus on the use of vacuum kneader, but also carry out timely and reasonable maintenance and maintenance according to its maintenance specifications. The maintenance specifications of vacuum kneader are as follows:

1. The vacuum kneader shall be cleaned, decontaminated and wiped with anti rust grease after installation. Check each lubricating point and inject lubricating oil (grease). Lubricating oil generally uses 30-40 mechanical oil. The new kneader shall be refueled for the first time after 500 hours of use, and the new oil must be replaced. After continuous work, replace it every six months (8-hour working system). If the working time is long every day, the oil change time can be appropriately shortened. The lubricating grease of the feeding valve and each bearing shall be replaced regularly. For the new feeding valve, the lubricating grease shall be sodium base grease.

2. Before start-up, check the tension of V-belt. During adjustment, the motor can be moved to the appropriate position through adjusting bolts. The belt tightness is appropriate. The transmission chain shall be checked, adjusted or replaced regularly. An appropriate amount of mechanical oil shall also be applied, and the chain shall be cleaned regularly.

3. Before commissioning, check whether the circuit and electrical equipment are safe. If it is an electric heating kneader, be sure to check whether its grounding device is reliable. The kneader room shall also be cleaned and idled for 10-15 minutes. It shall be put into production after confirming that the machine operates normally. Generally, the noise of new gear (including reducer) may be relatively large during initial use, and the noise will naturally decrease after running for a period of time.

4. When steam heating is used, the inlet pipe shall be equipped with safety valve and pressure gauge, and the steam pressure shall not exceed the operating pressure requirements of mixing cylinder according to the label knowledge. The steam pipeline is not allowed to leak. When the machine is stopped, close the valve and ensure the reliability of the safety valve and pressure gauge.

5. In case of paddle kneading, the use of reverse rotation shall be minimized.

6. There shall be no leakage of raw materials at the sealing part of wallboard.

7. Overhaul shall be carried out after six months of operation, check the damage degree of vulnerable parts, and make appropriate adjustment and replacement.


Recommended products
加勒比无码毛片| 日韩四十路| 手机观看国产A片完整版| 国产AV三级片| 国产性爱黄色片| 日韩三级片AV| 欧美极品色图| 操人妻av| 美女一级A片| 超碰人人干人人爽| 日韩AV中文| 黄页网站特级日B毛片| 大陆毛片| 人妻av在线| 日本啪啪天堂| 影音先锋人妻丝袜| 亚洲人妻色| 韩日成人| 蔡司无码AV| 成人无码黄色毛片| 美日韩A级毛片| 91AV婷婷| 91无码看片| 日韩一本视频| 91一级性爱视频| 一级黄色A片视频| 大香蕉A√| AV网站在线看| 超碰欧美操| 日本97AV| 四季AV日韩精品一区| 人妻av网导航| av天堂加勒比| 国产熟女AV| a级片免费视频| 香蕉视频亚洲一级| 毛片中心777777| 日韩黄色免费观看| 性爱 av 在线| 免费av资源网站| 亚洲A级片|